Posted by: westcoastice | December 8, 2009

December 8, 2009 (Thanks Peter and Drew)

Highway 99 South – Squamish
After 4 days of cold Nintendo should be in. This year the water flow is different given some hydro brush clearing and burning that took place on top of the crag this summer. It was in and climbable to the top although it was much more sporty than years past. I replaced the anchor on the top right of the climb. Top left anchor is missing as are the trees. Maybe time to put a couple bolts on top.

Highway 1 – Hope
Jailbait looks like it might be in – but pretty white. Probably not worth hiking an hour for yet.
On the other hand there’s a snow-free logging road above. Might be worthwhile coming in from the top while snow conditions permit?
EpicCentre, Trojan Horse, Bridal Falls, Never a Bride, Decent Divorce and White Wedding are not in yet.

Picadilly Circus and Powerhouse Falls were pretty white in the morning, but melting some in the afternoon sun.


Categories

%d bloggers like this: